Refineries
Process units, exchanger banks, piping circuits, and tankage assessed at component level between turnarounds.
Clear the backlog.
ABYSS puts measured conditions in front of the planners, so the turnaround list is built from evidence and the backlog finally moves. Defects across pressure equipment, and structures are classified, located, and ranked based on risk so you get to the most critical parts first.

Find the CUI a walkdown cannot see.
ABYSS can identify CUI candidates a general visual inspection misses and ranks them, sending NDE to the circuits most likely to be degrading instead of to a fixed percentage of the population. The damage that used to progress unseen between campaigns now shows up in the plan.

Why refineries run on ABYSS Fabric™

Scope from evidence, not from last cycle
The turnaround list is built from measured condition, located and ranked before scope freeze.
Capture while the unit runs
No waiting for the outage. Drone, laser, and 360 capture cover the unit live, and findings land in the plan months ahead of the shutdown.
Every circuit in one record
Findings sit in the same ISO 14224 hierarchy your CMMS already uses, so every vessel, circuit, and tank carries its history in one place.
NDE dollars where they count
A ranked worklist sends inspection and repair spend to the circuits that need it first, instead of a fixed percentage of the population.
Marine Terminals
ABYSS can also cover refineries with loading platforms or loading docks in a separate solution line. Terminals are the hardest assets to inspect and the most expensive to lose, which is why they are usually the worst documented. ABYSS changes that by grading every visible member using quantitative thresholds rather than opinion and saving exponentially on human effort.
In Inspection and maintenance scoping
Against about a week of lost throughput while divers work the structure.
Sharp enough to feed an engineering twin.

Supports the codes a refinery inspection program runs on.
- 01API 510pressure vessels
- 02API 570piping
- 03API 653aboveground storage tanks
- 04API RP 580 and API RP 581risk-based inspection
- 05API RP 571damage mechanism review
- 06API 579-1 and ASME FFS-1fitness for service









